Video Parts (3)
This clip is Part 1 of a 3-part film.
PROJECT MATTERHORN, CONSTRUCTION OF HSINCHING AIRFIELD, CHENGTU, CHINA Part 1
Description
Signal Corps 111 ADC 1811 ADC SOURCE: AFCF [AAF COMBAT SUBJ 1118) 1811 FILM: ARCH DN & APC MP 926 ea Silent PROJECT MATTERHORN CONSTRUCTION OF HSINCHING AIRFIELD Chengtu, China Miar 44 Seq: Chinese laborers mix sand, water, clay and rock for top layer material for airfield. Shovels and crude wooden boxes are used. LS, spreading of wet mixture on layer of heavy stones. LS, stock piles of stone; many coolies work in fg. MS, coolies use sand screens. LSs, Pans, entire project showing thousands of coolies engaged in varied activities. LS, long line of coolies cart rocks in wheelbarrows. MS, few coolies negotiate steep part of trail with great effort. MSB, draining and leveling walk of rice paddies. Record Group 111 CU, stones set on end for bottom layer of field. Accession Number III-NAV-210 MS, coolies place large stones for bottom layer in position. MS, gang laborers pull large rollers over surface of runway. LS. coolies prepare surface with hoes. ARMY PICTORIAL CENTER, 35-11 35th Ave., LIC 1, NY ERB/es
Read moreCollection
Records of the Office of the Chief Signal Officer
Series
Moving Images Relating to Military Activities
Related Videos
Chinese Film
Part 1
Signal Corps Tactical Photographer, Florence and Loianao, Italy
Part 1
Matterhorn Project - Construction of
Part 1
Munich. [No.] 111, War Crimes Trials, Nuremberg, Germany
Part 1
Signal Corps Cameramen, Germany
Part 2
Airfield Construction and Repair in the China-Burma-India Theater of War
Part 1
Landing Operations and Airfield Construction on Bouganville
Part 3
Los Angeles
Part 4