Explore everything with a free subscription

Video Parts (3)

This clip is Part 1 of a 3-part film.

Tags

PLEIGER #1 - GOERING WORKS (DIE HERMAN - GORING WERKE BAUEN) Part 1

Description

Signal Corps 111 ADC 8564 ADC 8564 SOURCE: WAR CRIMES COMMISION, APSD PS=1217 RG 111 FILM: ARCH & APC MP, 797 ea Comp (Standard) Accession III-NAV-210 PLEIGER #1 - GOERING WORKS (DIE HERMAN-GORING WERKE BAUEN) 1939-1941 NARRATION IN GERMAN General activity inside a steel mill is featured; CUs of molten steel and sparks, molten steel flowing and being poured; men pouring steel into small molds. Outside an engine pulls material; a truck pulls a great boiler. Large pipes are laid in deep trenches. Pipe sections are lifted and dropped into place by cranes. Men hammer the joints and fill the cracks with oakum. A cement covering is furnished and dirt piled into the trench. There is an extreme long shot of mills with a windmill in the fore= ground. The process of building a huge Bessemer converter is shown in detail. The interior of the steel works in operation. LS of a large plant in process of being constructed. ARMY PICTORIAL CENTER, 35-11 35th AVE, LIC 1.9 N Y ERBS/kfr

Read more

Collection

Records of the Office of the Chief Signal Officer

Series

Moving Images Relating to Military Activities

NARA ID
Subscribe
Local ID
Subscribe
Date
1939–1941
File
Subscribe
TRT
3:03