Explore everything with a free subscription

Video Parts (6 across 2 reels)

This clip is Reel 1, Part 1 of a 6-part film.

Tags

50-GALLON MECHANIZED FLAME THROWER Reel 1 · Part 1

Description

On the installation and operation of the flamethrower for a medium tank. The three units of the flamethrower are unpacked and disassembled. Each part is passed through the tank hatch and assembled. The fuel containers are filled and liquid and thickened fuels are compared. Demonstrates how to charge the pressure containers. Shows how to fire the flamethrower in short and sustained bursts. A mechanized flamethrower attacks a Japanese-type log and earth pillbox.

Read more

Collection

Records of the Office of the Chief Signal Officer

Series

Film Bulletins

NARA ID
Subscribe
Local ID
Subscribe
Date
1944-01-01
File
Subscribe
TRT
2:52