Explore everything with a free subscription

Video Parts (3)

This clip is Part 2 of a 3-part film. Watch from the beginning

Tags

FIXED BRIDGE CONSTRUCTION AND REPAIR IN THE CBI Part 2

Description

Reel 1 shows a bamboo footbridge over a stream. Piles are driven and trestles are placed for a bridge foundation. Elephants carry and pile logs; planks are cut at a portable saw mill; and a causeway is constructed over swampy ground. Reel 2 shows a double Bailey bridge, and a combination railway-pedestrian-highway bridge. Coolies in Burma carry materials on a walkway over the Salween River. Concrete bridge towers are constructed and cable is strung to support the bridge.

Read more

Collection

Records of the Office of the Chief Signal Officer

Series

Film Bulletins

NARA ID
Subscribe
Local ID
Subscribe
Date
1945-01-01
File
Subscribe
TRT
3:45