Explore everything with a free subscription

Video Parts (5 across 2 reels)

This clip is Reel 1, Part 2 of a 5-part film. Watch from the beginning

CONSTRUCTION OF WILSON DAM, MUSCLE SHOALS, ALABAMA Reel 1 · Part 2

Description

Reel 1 shows the Tennessee River at Muscle Shoals, steam shovels excavating, rock crushers in operation, workers' residences, children in school rooms and at recess, air hammers in operation, and foundations being poured. Reel 2, railroad cars are loaded with dirt, the river is dredged, gravel is processed, concrete mixed, wooden forms constructed and set in position, concrete poured, and turbines placed in position. Shows panoramic views of the operations and water pouring through newly constructed spillways.

Read more

Collection

Records of the Office of the Chief Signal Officer

Series

Historical Films

NARA ID
Subscribe
Local ID
Subscribe
Date
1936-01-01
File
Subscribe
TRT
3:52