Video Parts (3)
This clip is Part 1 of a 3-part film.
ENGINEER CORPS: STANDARD GAUGE RAILWAY ACTIVITIES[1918] Part 1
Description
On railroad construction in France. Steel ammunition cars are assembled at St. Nazaire. 28th Engrs. operate a stone crusher at Trondes. 21st Engrs. load cinders and crushed rock on railroad cars at Vertuzey. Shows railroad tracks and bridges built by the Engineer Corps. 16th Engrs. repair track near Sedan. 23rd Engrs. steamroll a road bed near Varennes. Shows a derailed train. Freight trains pull into the yards at Verneuil.
Read moreCollection
Records of the Office of the Chief Signal Officer
Series
Related Videos
[Ford Cars Climbing Pikes Peak]
Part 2
Ford Reconnaissance Cars Join the Army
Part 2
[Ford Cars]
U.S. Navy Service School / Ford Reconnaissance Cars Join the Army
Part 1
Railroad Construction, St. Lo Sector, France
Part 1
Transportation Secretary Norman Y. Mineta at the National Rail Safety Action Plan
Part 6
Soviet Transportation Railroads and Waterways
Part 3
Railroad Engineer
Part 3