KSC - AS-205, CSM-101, and SLA-5 Erection and Mating to AS-205 Booster and LES Erection Part 3
Description
CATEGORY: Spacecraft, Launch Vehicle - Apollo Pg. 1 of 3 Ref No. SOURCE: Kennedy Space Center - KSC DATE RECD. FILE ROLL NO. C 688-09- FILM SITE: Launch Complex 34 16 FILMED: 8/9/68 8/27/68 6965 REMARKS: CLASSIFICATION MATERIAL FOOTAGE UN O/M as O 387' FOOTAGE CAMERA SUBJECT: KSC - AS 205 CSM 101 and SLA-5 Erection and Mating to START ANGLE AS 205 Booster, and LES Erection. FOREWORD: CSM (Command Service Module) 101, and LA(Spacecraft LM Adapter)-5, AS-205 Booster, LES (Launch Escape System), LC (Launch Complex) 34. 10 SLATE: 8/9/68, Roll 1, CSM 101 and SLA-5 at LC 34. 45 MS Technician standing by transporter, this footage is dark. 49 MLS Transporter, tilt up to CM. 60 MS Technicians preparing to hoist the CSM 101 and SLA-5. 70 CU Sign reading, "Caution Explosives Installed", tilt up to show CSM and SLA-5. 82 MS Low angle view: Hoist attached to the CSM. 85 MS Men talking. 93 MS Men walking away from transporter. 95 MS Two men. 98 MS One man talking. 9 MS Three men talking. MS Continued action. 107 MS Men in hi-ranger being hoisted. 115 MS Continued action. 121 MS Men in hi-ranger. 122 MS Men in hi-ranger being hoisted. 128 MS Low angle view: Continued action, different angle. 131 MS Continued action. 134 MLS Men in the hi-ranger working on SLA-5, tilt up to CSM. 142 MLS Men in hi-ranger in the foreground, CSM and SLA-5 in the background. 145 MS Technicians in hi-ranger working on the SLA-5. 152 MCU Group of men talking. 155 MS General activity, tilt up to hi-ranger and SLA-5 then to CSM. 107 CU Men writing in book. 170 CU Men talking. C For 981 ( < Oct 4) 6MM F M SCE : LIST ; NAS Monne Docector Center Pg. 2 of 3 Ref No. SOURCE: DATE RECO. FILE ROLL NO. 6965 REMARKS: CLASSIFICATION MATERIAL FOOTAGE FOOTAGE CAMERA SUBJECT: START ANGLE 173 MS Low engle view: Technicians in hi-ranger working around SLA-5. 170 MLS Low angle view: Continued action. 179 MLS SLA-5 and CSM 101 being hoisted, tilt up to CSM. 188 MS Technicians holding guide lines. 191 MS Low angle view: CSM and SLA-5 being hoisted. 194 MLS Low angle view: Continued action, different angle. 199 MS Technician in the foreground holding guide line other men standing around watching. 202 MS Technicians holding guide lines. 208 MLS Low angle view: CSM and SLA-5 being hoisted. 215 MS Low angle view: Continued action. 218 CU Man's face. 222 CU Continued action, second man enters frame right then exits frame right. 229 MS Back of man's head, tilt up guide line to CSM and SLA. 245 MLS Low angle view: CSM and SLA being hoisted. 250 CU Low angle view: Bottom of the SLA, tilt up to CSM. 9 LS Low angle view: CSM and SLA-5 being hoisted. 3 MS Low angle view: CSM and SLA-5 moving into LC 34. 209 MS Low angle view: Continued action. 273 MS Low angle view: Continued action. 276 MLS Low angle view: Continued action. 280 MLS Low angle view: Continued action. 283 MLS Low angle view: Continued action. 288 MS Low angle view: Continued action, different angle. 294 MS Low angle view: Continued action, different angle. 300 MLS Low angle view: Continued action. 306 MLS Low angle view: CSM and SLA-5 in LC 34, being lowered to the AS 205 booster. 320 LS Low angle view: Continued action, different angle. 335 MS Low angle view: Continued action, different angle. 343 MLS Low angle view: Work platforms closing around CSM and SLA-5. I C Forr. 181 (i / Oct τ) MM F M SCE LIST, ; NAS, Manne. acecro Center Pg. 3 of 3 Ref No. SOURCE: DATE RECD. FILE ROLL NO. 6965 REMARKS: CLASSIFICATION MATERIAL FOOTAGE FOOTAGE CAMERA SUBJECT: START ANGLE 347 MLS Low angle view: Continued action. 350 MS Continued action, different angle. 358 MS LES on transporter. 359 MS Continued action, different angle. 364 MS Continued action. 380 MS LES enroute to LC 34. 387 END OF ROLL. HSC Fc 1 981 ev O. 64) 16MM ILM S. NE LI. AG K . - Mar. ; Space it Cente
Read moreCollection
Records of the National Aeronautics and Space Administration
Series
Moving Images Relating to Documentary Stock Footage