Explore everything with a free subscription

Video Parts (3)

This clip is Part 1 of a 3-part film.

Japanese TRANSPORTATION Part 1

Description

MS Series of shots taken at the Shinjuku Station, Tokyo, showing heavy crowds arriving and leaving, using ticket office, turnstile. Series of shots taken along the RR tracks of the Tokyo suburban line which shows the various types of trains, coaches, etc. All scenes taken from various angles. LS Dolly down a stretch of road between Beppu and Oita along the coast showing one of the few good roads in Japan that has not been damaged by bombings or hard usage. Streetcar and railroad tracks run along the side of the road. MS Pan R to L from a windblown pine on the edge of the highway to the highway itself with bicyclists passing by. MS Young calves being loaded onto boat tied at pie next to street running along the waterfront of Beppu. Calves were loaded aboard by means of a crane, to be shipped to Shikoku. MS People waiting to board the train at Beppu Station, the arrival of the trains and people milling around the doors trying to get aboard. Other people leaving exits of the station. Misc. shots taken on RR platform at Beppu Station. CU of sign. MS Japanese soldier patiently waiting on the platform. Camera mounted in front of the electric engine which pulls the train under the tunnel at Moji. The misc. scenes show the Moji entrance to the tunnel. Moving shot from beginning of tunnel entrance to the tunnel mouth and a moving shot of the tunnel exit on Honshu (Shimonoseki). Misc. scenes of the various buildings and RR installations along the right of way from the exit at Shimonoseki. Scenes from the side of moving car showing homes, vegetable gardens and fire breaks. Data on Tunnel: Tunnel Length = 4000 meters. Shore to Shore (Kyushu to Honshu) = 1200 meters. Depth of Water = 20 meters (deepest area). Depth of Water = 8 meter (shallowest area). Depth of Water between top of tunnel and bottom of water = 8 meters (min.), 12 meters (max.). Date construction started = 19 Sept. 1936. Date completed with single track = 12 April 1942. Date double track started = 7 Jan. 1942. Date double track completed = 3 June 1944. MLS Kanmon Tunnel, Target 90:34-2174, which connects Honshu and Kyushu. View taken looking approx. NE and shows an electric locomotive, moving in the direction of Dairi as it comes out of one of the twin reinforced concrete tubes which taken together form a box construction. MLS Electric locomotive pulling an express passenger train as it comes out of the Kanmon Tunnel on the Dairi side. MS Train entering Ube Station from Shimonoseki. The steam locomotive is covered with people who could not find standing room in, on, or between the cars. MS Passengers attempting to board the train after having waited its arrival for hours at Ube Station. An ex-soldier expedites his own arrival on Ube Platform by climbing out a window to avoid the crowd. A passenger boards the train by the accepted procedure of climbing in the nearest window. The train pulls out of the Nishi Ube Station for Itozaki and points N. People riding wherever they can get a foothold. It is a common occurrence to see well-dressed women in gayly colored kimonos hanging on to a train. LS Express train which has just left the Shimonoseki Tunnel nearing Moji Station. This shot was taken looking NW from Moji Station. LS CS Series of shots showing a Japanese version of American Red Cross procedure at a train stop. Train bearing discharged soldiers from the island of Formosa just pulled into the station and women with tea pots proceeded to fill canteen of Japanese soldiers with tea. Otake, Japan. March 3, 1946. (under-exposed).

Read more

Collection

Records of U.S. Air Force Commands, Activities, and Organizations

Series

Moving Images Relating to Military Aviation Activities

NARA ID
Subscribe
Local ID
Subscribe
Date
1946
File
Subscribe
TRT
3:17