OPERATION TURNKEY, TUY HOA AB, VIETNAM AND TAIPEI AS, TAIWAN Reel 1 · Part 1
Description
Coverage of a single-package construction program dubbed Project Turnkey for building Tuy Hoa AB. Shows mainly the building of unloading ramps, offloading first supply ships by barges and landing crafts, including heavy equipment, construction of road, new pier, and runways, laying foundation of contractors billets, and erection of prefab living quarters. Also shows typhoon damage and F-4Cs taking off, flyovers, landing and taxiing. Reel 1: SLATE: ROLLS: R30C-7X-633, 635, 637, 577, 587, 588 AND 590. 1) Scenes of prefab living quarters being uncrated, nailing supports, putting wedging between sections and Pettibone 30 Multikrane lifting section to ground. 2) Shows Vietnamese women and US contractors laying foundation for contractors billets, caterpillar with scoop digging trench and Vietnamese and USAF personnel digging in trench with shovels. 3) Sequence of scenes showing heavy equipment including dump truck, Euclid Tandem-14 loader being offloaded from the Inger Skou of Danish registry onto barge, intercut with operator at winch, and stevedores preparing equipment for hoisting onto barge and guiding equipment down. 4) Shows Vietnamese workers and American preparing roof section for hoisting, a Pettibone 30 Multikrane lifting roof section in place on prefab building, intercut with shots of the crane operator at controls. 5) Scenes of Allis Chalmers tractor with angle blade pushing dirt on roughed-out runway, intercut with shots of the operator. 721': Total footage in reel. Reel 2: SLATE: ROLLS: R30C-7X-591, 592, 593, 594, 595, 37 AND 629. 1) Scenes of Filipino stevedores preparing a Hancock earthmover and tractor for hoisting from ship onto barge, and earthmover, tractor and truck being lowered onto barge, intercut with winch operator. 2) MLS of completed section of prefab building. 3) Scenes of barge being untied from ship and tug towing barge away from ship and toward shore. 4) Scenes of LST B. B. Beacher pulling into shore, lowering ramp and MACK truck driving off LST and onto beach. 5) ELS of Inger Skou anchored in bay. 6) MLS of LST B. B. Beacher underway to shore--Inger Skou in background. 7) MSs and MCUs of men pulling on-rope to bring barge closer to ship. 8) Scenes of Red Horse personnel surveying for runway, marking point with tape and plumb bob, Vietnamese man sweeping sand off of starter strip for AM-2 matting, Col. David S. Chamberlain, top Turnkey official at Tuy Hoa AB, observing, and starter strip being fastened together. 9) Shows Vietnamese men thatching roof on new hut at relocation sight, fixing tyings for roof, and sawing bamboo. 703': Total footage in reel. Reel 3: SLATE: ROLLS: R30C-7X-631, 653, 715, 730, 745, 746, 912 AND 920. 1) Scenes in the relocation area of Vietnamese men erecting frame of poles to new hut, unloading truck and truck dumping rest of bamboo framework and thatch on ground, tying poles together on roof, and thatching roof. 2) Overall shot of the dock area where construction supplies are unloaded--shows fork lift moving bags of cement and depositing on trailer, crane lifting pallets of cement bags from boat, and truck loaded with cement pulling away. 3) Scenes of EOD personnel preparing to sweep old mine field at end of runway--shows them carrying 43-lb cratering charge, emplacing it, explosion and Capt. Black, AF advisor, watching. 4) Scenes of Vietnamese man building small hut. 5) Scenes of Red Horse personnel laying the first section of AM-2 matting on starter strip for runway, fork lift bringing in sections of AM-2 matting as Col. Chamberlain observes. 6) Scenes of men surveying for runway. 7) LS of explosion at rock quarry on Mt. Chap Chai near Tuy Hoa. 800': Total footage in reel. Reel 4: SLATE: ROLLS: R30C-7X-943, 958, 961, 1130, 1132, 1133 AND 1134. 1) Scenes of Vietnamese and USAF personnel tearing down hut in preparation to moving it to new site--shows thatch roof being removed, strips of straw carried to truck and stacked, horse-drawn cart passing through scene, truck driver splitting bamboo, loading boat hull on top of truck load, and truck pulling away. 2) Shows popular forces (Vietnamese) loading furniture on MACK 460 truck to move their headquarters, AF major and truck driver observing and loaded truck pulllng away. 3) Shows Vietnamese men tearing down a building and loading brick on dump truck. 4) Shows EOD personnel placing cratering charges in old land mine field, explosions, reaction of spectator and evaluating the results. 5) Sequence covering the soil-cement treatment for the base of a runway showing cement bags being evenly spaced on the compacted natural soil, breaking open cement bags, runway sweeper sweeping the cement, a ROTO-MIXER in operation on the runway, and Vietnamese men marking the soil for cement bags (one per three square feet). 6) Scenes of cement being offloaded at port supply area showing crane sling being put around cement bags and lifted, the crane operator at controls, and fork lift moving pallets loaded with cement bags to storage location. 779': Total footage in reel. Reel 5: SLATE: ROLLS: R30C-7X-1135, 1137, 1138, 1140, 245, 499, 507 AND 570. 1) Different views and angles of a fork lift putting pallets of cement bags on trailer. 2) Scenes of EOD personnel warning Vietnamese women of an explosion that is about to take place. 3) LS of explosion with MS of the cratering area. 4) AVs of the contractors camp, Red Horse area, Grey Eagle area, contractors storage and shop area, and the soil-cement treatment for base of AM-2 runway. 5) Scenes of EOD man fixing a cratering charge, series of four explosions, the cratered area, and Capt. Black who is in charge of the operation. 6) Shows handler taking his dog from kennel, the dog attacking padded arm of agitator, dog being returned to kennel and handler getting bucket of water from water trailer. 7) Pilot's view from C-130A as aircraft taxis out and takes off from Taipei, Taiwan--includes scenes of flight engineer, copilot and pilot during flight. 8) Shows civilian men and an airman boarding a C-130A and aircraft engine starting. 9) LS and LS of C-130A taxiing out and taking off to right from Taipei, Taiwan. 10) Scenes at Taipei AB of Hyster loading pallets of cargo into C-130A and pilot briefing civilian personnel at side of aircraft. 744': Total footage in reel. Reel 6: SLATE: ROLLS: R30C-7X-5l9, 530, 531, 534, 331, 493, 494 AND 495. 1) MCU, CU and LS high angle from top of aircraft looking over engine showing Firebird marking of the 17th Troop Carrier Wing and an AF Outstanding Unit Citation ribbon on side of C-130A. 2) CUs of Firebird on hat of flight crewman--zoom back to show his face, intercut with the Firebird marking on C-130A. 3) Scenes of Hyster loading cargo into C-130A at Taipei as directed by loadmaster. 4) Scenes of Vietnamese women filling sandbags--shows them shoveling sand into make-shift barrel and catching sand in bag at other end, shoveling sand directly into bag, tying bags and turning sandbags inside out. 5) LS and MSs of aircraft number and AAC shield insignia on tail of C-130A at Taipei AB. 6) Pllot's view during flight, landing and taxiing in at Taipei AB. 7) Scenes of Allis Chalmers loader/scoop being lowered onto barge, cable being unhooked from loader/scoop, boom cable being raised back up to ship, and acetylene tanks being lowered to barge and arranged. 8) LSs of Pacific Mariner (tug) with two barges on both sides turning around and coming up along side of ship. 673': Total footage in reel. Reel 10: SLATE: ROLLS: R30C-7X-546, 568, 570, 572, 1142, 1143, 1143A AND 1144B. 1) LSs of large bulldozer being lifted out of OLAU JARL ship's hold. 2) Shows beach storage area with trucks dumping loads of mixed sand and rock in the parking area and bulldozer leveling it out. 3) Shows crane lowering ramp for barge, a Pettibone 30 Multikrane with air compressor suspended from boom driving off of barge and a road grader driving off. 4) Scenes of heavy equipment breaking ground for the AM-2 aluminum matting runway, the runway in relation to the beach, Caterpillar D-9C pushing earthmover and the caterpillar driver as he operates controls. 5) Scenes of a "Planning Meeting" in process with Col. Chamberlain presiding, Lt. Col. Albright listening and other officers talking, including a Maj. Lamb. 6) AVs of the runway under construction from NE to SW, a village that is to be moved for the runway, port under construction, ships unloading cargo in Vung Ro harbor include the KINGS REACH, ROTEN FELS, LONDON ADVOCATE, HELLE SKOU and MSTS's. 7) Scenes on the AM-2 runway showing key-ways (starter strips) being put down and bolted together and fork lift bringing aluminum matting sections. 777': Total footage in reel. Reel 13: SLATE: ROLLS: R30C-7X-579, 564, 565, 566, 567, 569, 571:AND 573. 1) Scenes of Ford Bronco vehicles driving off barge; crane offloading barrels and tractor dolly, including scenes taken from inside crane cab and chains being hooked around the barrels, lifting barge ramp and lowering it to sand, swinging dredge buckets to shore; loader with fork lift removing shipping crates and fuel storage tank from barge; and mobile crane driving off barge. 2) Establishing shots of area where men are pouring a storage warehouse foundation with cement mixer and wheel barrow. 3) MS of barge and LST coming into shore. 4) Shows a loader with fork lift lowering barge ramp. 5) Scenes of crane being lowered onto barge--men watching from barge as it pulls away from OLAU JARL with CU of the ships name and churning water. 6) MS of men on barge throwing rope ashore. 7) Scenes of Allis Chalmers tractor with blade pushing sand from dock and dump truck unloading rocks into scraped out dock ramp. 731': Total footage in reel. Reel 14: SLATE: ROLLS: R30C-7X-574, 575, 576, 582, 585, 549, 550 AND 552. 1) Scenes of mobile crane being lowered from the OLAU JARL ship onto barge and stevedores unhooking lifting cables. 2) Shows barge tied up to tug, Pacific Mariner, and barge as it moves away from OLAU JARL ship. 3) LS from barge showing several ships anchored in bay--beach and docking area in background. 4) Shows beach and dock as barge moves closer to shore and the offloading of mobile crane from barge. 5) AVs of railroad track going south and north of Tuy Hoa AB showing torn out sections of track and collapsed bridges--shadow of UH-1B on sand; Thy Hoa AB coming up the coast line--shows peninsula, future runway area and boat dock area. 6) Scenes at docking area showing an Allis Chalmers fork lift moving crate to storage area as UH-1B flies over and depositing cables. 7) Shows a Hobbs trailer being lifted from a Philippine registered ship onto barge and crane lifting the trailer off of barge at docking area. 8) LS and MS of fork lift carrying AM-2 matting to storage area and depositing it. 9) LS from barge as it approaches the CHRISTIANE SCHULTE ship and pulling away. 10) LS of Pacific Mariner tug moving away. 11) Scenes approaching docking area showing man throwing rope over to the B. B. BEACHER LST, the barge being pulled to shore and Allis Chalmers fork lift lowering the barges ramp. 747': Total footage in reel. Reel 16: SLATE: ROLLS: R30C-7X-563, 334, 496, 497, 508, 509, 540 AND 541. 1) Scenes of man operating anchor pulley, pulley turning, and cable coming out of water. 2) LSs of USN tanker PISCATAQUA and men on barge passing rope up to men on CHRISTIANE SCHULTE. 3) Shows fork lift picking up aluminum matting cases at storage area. 4) AVs showing condition of railroad track, railroad bridge out, highway bridge in good condition, two different sizes of railroad bridges intact in a radius north and south of Tuy Hoa AB, also shows a village. 5) Scenes of men pouring concrete foundation for storage area, the cement being mixed, moved by wheel-barrow, dumped, and leveled out. 6) Shows Allis Chalmers fork lift removing AM-2 aluminum matting cases from barge. 7) LS of fork lift placing welder on barge. 781': Total footage in reel. Reel 17: SLATE: ROLLS: R30C-7X-542, 544, 547, 548 596, 725, 726 AND 731. 1) LSs of fork lift taking cases of AM-2 aluminum matting to storage area and returning for another load. 2) MLS and LS of LST coming in toward shore and Allis Chalmers with lift pulling LST in closer. 3) Scenes of cables being hooked up to trailer van and hoisted out of ship's hold and lowered onto barge--Pacific Mariner tug at side of barge. 4) Scenes of tractor starting to pull trailer van off of barge; Ford Bronco vehicles driving off barge--trucks dumping dirt in foreground; crane offloading barrels. 5) MCU, LS and CUs of Vietnamese shoveling sand into barrel that serves as a funnel for filling sandbags and tying the filled sandbags. 6) Shows heavy equipment moving earth near graveyard located by runway with ECU of headstone with Vietnamese inscription. 7) Shows LSU BUTLER washed ashore, being pounded by breakers and some breaking over the top--also shows a grounded barge with large plastic covered containers on it being subjected to the same conditions. 8) Shows earthmover emptying dirt and Allis Chalmers bulldozer leveling dirt. 9) Scenes covering the preparation for the sub-cement treatment for runway showing markers being fixed and pulled through the soil for placement of cement bags, loader with scoop depositing pallet of cement bags and Vietnamese workers placing a cement bag every three feet. 716': Total footage in reel. Reel 21: SLATE: ROLLS: R30C-7X-465, 468, 469, 472, 474, 478, 481, AND 482. 1) Scens from LST as it approaches ship NEVA WEST, men trying the LST up against the ship, and the LST moving away from the NEVA WEST. Also shows Allis Chalmers with lift being hoisted up and lowered onto the LST with cutaway shots of winch operator and deck personnel observing. 2) AVs of Tuy Hoa AB showing contractor' area, ships in harbor, unloading area at shore, small airstrip, and areas of future construction now occupied by the Army. 3) LSs showing area where the 8000-ft runway is to be built--ROK camp in distant background of first scene. 4) Travel shot from jeep carrying Civil Engineering officer as it passes through ROK checkpoint leaving Tuy Hoa AB and proceeding toward rock quarry. 5) Scenes of LST B.B. BEACHER and barge moving into shore--shows man pulling rope to shore, name on the LST, the LST B.B. BEACHER leaving shore, maneuvering over to empty barge, the barge lifting ramp and the barge being pulled up to the LST B. B. Beacher by ropes. 6) Shows workers piling cement bags on truck, driver getting in truck and pulling away, then another truck backs down shore ramp to get loaded at barge. 7) Scenes of workers putting cement bags on pallets on the barge, sling of cement bags being lowered from ship to barge and cement dust from broken bag. 791': Total footage in reel. Reel 23: SLATE: ROLLS: R30C-7X-338, 458, 476, 479, 480, 233, 259, AND 287. 1) Scenes of loader with lift unloading AM-2 aluminum from barge and moving toward storage area. 2) Scenes of the first load of AM-2 aluminum matting being unloaded from the ship NEVA WEST onto barge with shots of the winch operator. 3) Shows workers getting ready to pour cement floor for the new warehouse and dumping wheel barrows of cement. 4) LS of barge and LST underway. 5) Scenes of workers on shore watching the incoming barge, a wrecker backing to ramp of barge, the wrecker operator, and tug being pulled in closer to shore. 6) LS and MSs of truck arriving at cement storage area, driver getting out of truck and taking weights off plastic covering cement bags. 7) Scenes of LST ramp closing as seen from insider anchor rope coming in, man operating pulley, anchor coming out of the water. 8) CUs of churning water--pan to shore area. 9) Shows arrival of the ship NEVA WEST--ship in foreground is the DUMAI TRADER. Also shows a tug pushing an LST. 772': Total footage in reel. Reel 24: SLATE: ROLLS: R30C-7X-371, 378, 380, 382, 388, 393, 455 AND 381. 1) Shows an Allis Chalmers with lift being hoisted up and lowered onto the LST with shots of winch operator working controls and deck personnel observing from the NEVA WEST--Pacific Mariner alongside the LST. 2) Sequence of scenes of men working on ramp drive at shore unloading area showing planking being carried off barge, dropping it, pounding the planking flush and nailing; and US engineers watching and inspecting work progress (Fair-good). 3) Cutaway shots of anchor winch in operation, anchor pulley and line, gears in anchor winch and winch operator. 4) LSs of the shore and the ship DUMAI TRADER. 5) Scenes of a tug, Pacific Mariner, pulling alongside the LST B. B. BEACHER, the ship DUMAI TRADER, the LST nearing the ship and men pulling on rope with CU of the US and Vietnamese flags flying on the Pacific Mariner (tug). 6) Scenes of a tractor/scoop transporting a Porta-Kamp package to erection site and personnel unfolding and erecting the Porta-Kamp tent. 7) Shows barge and LST B. B. BEACHER at shore--planking being offloaded from the barge. 803': Total footage in reel. Reel 25: MLSs of three F-4Cs landing and two F-4Cs taking off to the left. 44': LSof two F-4Cs taking off separately. 58': SLATE: ROLL: R30C-7D-607. 63': MLS and LSs of three F-4Cs taking off to the left. 87': SLATE: ROLLS: R30C-7D-607 (TAIL) AND R30C-6D-132. 99': MSs of two F-4Cs starting takeoff rolls to the left. 120': LSs of three F-4Cs flying overhead and peeling off. 135': LSs to MSs of three F-4Cs landing to the right. 169': LSs to MSs of two F-4Cs taxiing--one into parking area. 191': SLATE: ROLL: R30C-6D-133. 202': Scenes of F-4Cs taxiing and parking, and crew chief putting ladder up to aircraft. 253': LS and MLS of F-4Cs taxiing off runway onto taxi strip and releasing drag chute with canopy open. 300': SLATE: ROLL: R30C-6D-134. 307': LSs of F-4C taxiing off runway, being disarmed, taxiing out onto taxi strip, and flyover with tailaway shot. 366': LSs to MS of three F-4Cs taking off to right, singly. 397': SLATE: ROLL: R30C-6D-135. 405': LSs of two F-4Cs landing to right, singly. 424': LS to MS of F-4C taxiing into refueling area. 458': LS of F-4D and F-4C taxiing to the left. 487': MS of steps being put up to F-4C. 495': Total footage in reel.
Read moreCollection
Records of U.S. Air Force Commands, Activities, and Organizations
Series
Moving Images Relating to Military Aviation Activities
Related Videos
Usms Activities & Building Landing Strip, Palmyra, Is
Part 2
Building Together: the Uijongbu Story - 1955
Part 2
Wartime Ship Building
Part 1
Building for Quality
Offloading of Gt-8 From USS Mason
Part 2
A4w Fide Training Simulator Building Dedication Ceremony
Part 3
Msts Arctic Operations 1956
Part 8
Bridge Building with the CCC
Part 2