Video Parts (3)
This clip is Part 1 of a 3-part film.
WIND TUNNEL AT N.O.L., WHITE OAKS, MD Part 1
Description
1) LS Wind tunnel room during operation.2) MCU Wind tunnel camera in operation.3) CU Cameraman loading camera.4) MCU CU Changing model in tunnel.5) MS Men working on a blow.6) MCU Ground glass of camera during the blow.(Schlieren lines forming around missile)7) CU Gate valve opening and closing.8) LS Pump room.
Read moreCollection
General Records of the Department of the Navy
Series
Moving Images Relating to Military Activities
Related Videos
Sheet Metal Supersonic Wind Tunnel Test and V-2 Rocket Tests
Part 1
Avrocar Model Wind Tunnel Tests
Part 3
Inch by 16 Inch Supersonic Wind Tunnel
Part 1
Opening of the Propulsion Wind Tunnel
Part 2
Pathe News (Ford Back to Work) / Detroit News Topics (Ford Back to Work) / Power Plant Water Tunnel Construction
Part 3
Tunnel Operation in Mexico
Part 4