SALVAGING USS SQUALUS (SS-192) OFF ISLES OF SHOALS (Portsmouth, N.H.) Dup neg 1-14663 Part 3
Description
1) MS Men rigging pontoon; and attaching hose to same.2) MCU Unrigging the "flowerpot."3) MS Pontoon is raised.4) SHS Line raises pontoon up from water.5) MS Man closes vents; pontoon is raised; YSP, blown-dry, ready to leave the USS FALCON (ASR-2).6) MS Drawing: How the SQUALUS is to be raised by the slings and pontoons.7) MS GV USS SACRAMENTO (PG-19) passes; small district craft goes about.8) MS USS SCULPIN with air hose attached.9) GV Many buoys on water.10) MS Air hoses; men working with dials; pontoon in water, blown-dry.11) MS Stern pontoon surfaces and causes gushing of water; men secure pontoon.12) MS As bow of SQUALUS is raised to sur, pontoon & sling slip off and bow settles back into water.13) MS Chart showing bow sinking.No. 17272: mait 4-8319 (use as master) Length: 470 ft. Dup neg, 1-146641) MCU Drawing: How the sling & bow pontoon slipped off.2) MCU Men raising "flowerpot" with heavy chains.3) MS Man at control panel.4) CU Dial panel.5) MCU Helmet of diving uniform.6) GV Storm at sea: Rain; choppy water.7) MS Drawing: Sub on ocean's bed with sling & pontoon hitched to it.8) SHS PAN Men working with gear and lines, aboard repair ship.9) MS Men let out reeving plate, by means of lines.10) MCU Reeving plate.11) MS Barge; PAN Sailors in boat; tugs.12) MS PAN Buoys on water.13) SHS Men securing lines and blowing same from USS SACRAMENTO & SCULPIN (SS-494)14) MS Drawings: The SQUALUS, showing first, the stern pontoon which will lift; then, the bow pontoon; and the sub on an even keel.No. 17273 Pos. 4-8320 (use as master) Length: 332 ft. Dup. neg. 1-146651) MS Men at control board.2) SHS Buoys on water; stern pontoon surfacing; water gushing.3) MS Men in boat underway to pontoon; they leave boat and walk about on pontoon.4) MS Mooring line from the FALCON (ASR-2) to the pontoon.5) MS Bow pontoon is raised, causing water to gush.6) SHS Men leave boat & walk about on pontoon; small district craft "milling" about.7) SHS FALCON'S mooring lines hauled in.8) MS Air hose bursts and causes water spray; men repair break.9) MS Drawing: SQUALUS with sling & pontoons attached to stern and bow.10) MCU Pontoon with hoses attached; sailors raising buoys.See also Nos, 17270, 20017, 20018, and 20019.QUALITY FAIR
Read moreCollection
General Records of the Department of the Navy
Series
Moving Images Relating to Military Activities
Related Videos
Invasion of Guam: Land Action & U.S. Flag Raised Over Guam
Part 1
Salvaging USS Squalus (SS-192) Off Isles of Shoals (Portsmouth, N.H.) Dupe Neg 1-14663
Part 3
Unloading Operations on Pontoon Causeway, Guam
Part 1
Panama Canal, The. 1,2,3,4,5
Part 2
Seabees Assemble Rhino Pontoon, Load LST, Plymouth, England
Part 1
The Ford Tri-Motor on Pontoons, Being Tested on the Detroit River / the Ford Tri-Motor on Pontoons and Boat Races
Part 2
Jsc (Ms) - Sts 51-L Ms Onizuka and McNair Wet-F Training
Part 4
Jsc (Ms) - Charlie Bolden Presentation
Part 2