Video Parts (4)
This clip is Part 1 of a 4-part film.
USS FORRESTAL (CVA-59) Part 1
Description
1) MS Railroad crane with prefabricated section of USS FORRESTAL (CVA-59) suspended;moving toward camera.2) MS Prefabricated section suspended from dock crane; railroad crane in FG, (SV).3) MS Prefabricated section suspended from dock crane swinging out to R; railroad flat car moves out of picture to R.4) LA MS Section being lowered by crane.5) MS Section suspended over dock and being lowered onto barge (SV).6) MS Section on barge approaching dry dock; tug alongside, (SV).7) MS Section being lifted from barge.8) MS Section being hoisted over end of dry dock.9) MS Section of underside of stern being lowered down into dry dock; men using cutting torches at R, (SV).10) HA LS General construction area showing progress on FORRESTAL as of 7/7/53.11) HA MS Prefabricated position being lowered into position.
Read moreCollection
General Records of the Department of the Navy
Series
Moving Images Relating to Military Activities
Related Videos
Jsc (Ms) - Sts 41-G Zero-G Training
Part 3
Msfc (Ms) - 41-B (Sts-2) Srb Separation and Re-Entry
Part 1
Jsc (Ms) - Sts 51-L Ms Onizuka and McNair Wet-F Training
Part 1
Experimental Crane
Jsc (Ms) - Visitor Center, Illustrations, Rocket Park and Exteriors of Building 2
Part 6
Crane Lifting and Turning Railroad Locomotive / Fordson Tractor Advertising Parade, Detroit, Michigan / "Home" Made: Prefabricated Homes / Panama City, Panama Canal Zone
Part 3
Transportation Secretary Norman Y. Mineta at the National Rail Safety Action Plan
Part 3
Departure of the USS Forrestal (Cva-59)