Pathe News (Ford Back to Work) / Detroit News Topics (Ford Back to Work) / Power Plant Water Tunnel Construction Part 3
Description
The original catalog description provided by the Ford Motor Company reads as follows: a. “Ford Puts 107,000 Men to Work. Dearborn, Michigan. Auto factory resumes full operation as industry starts on upward trend.” Views of workers going to plant - views inside plant, men, parts, and machines - night shift going to work. [1931] b. “Auto Workers Start to Work.” Workers leaving trains, walking to work - views inside plant, men, parts, and machines. [1931] c. Men working inside tunnel, moving clay - men operating hydraulic erector putting blocks of concrete in ceiling - men pushing loaded and unloaded hand cars into and out of tunnel - two men talking at entrance to tunnel - view of workers and cars at entrance - workers rolling concrete blocks on car into tunnel, attaching block to crane, crane moving block into position for erector to pick it up - erector picking up block, swinging it into place in roof of tunnel. [1930]
Read moreCollection
Series
Related Videos
Engineer Hotwash
Part 6
Focus on Progress: Engineering Faculties
Part 2
[Progress Report 1952. Part III]
Part 2
Human Engineering and the Cortical-Evoked Response
Part 1
Henry Ford at Greenfield Village and Ford Engineering Laboratory / Combine in Field
Part 2
Tidal Power
Part 3
President Franklin Roosevelt Visits Passamaquoddy Dam
Progress Report-1953
Part 5