PLEIGER #1 - GOERING WORKS (DIE HERMAN - GORING WERKE BAUEN) Part 3
Description
Signal Corps 111 ADC 8564 ADC 8564 SOURCE: WAR CRIMES COMMISION, APSD PS=1217 RG 111 FILM: ARCH & APC MP, 797 ea Comp (Standard) Accession III-NAV-210 PLEIGER #1 - GOERING WORKS (DIE HERMAN-GORING WERKE BAUEN) 1939-1941 NARRATION IN GERMAN General activity inside a steel mill is featured; CUs of molten steel and sparks, molten steel flowing and being poured; men pouring steel into small molds. Outside an engine pulls material; a truck pulls a great boiler. Large pipes are laid in deep trenches. Pipe sections are lifted and dropped into place by cranes. Men hammer the joints and fill the cracks with oakum. A cement covering is furnished and dirt piled into the trench. There is an extreme long shot of mills with a windmill in the fore= ground. The process of building a huge Bessemer converter is shown in detail. The interior of the steel works in operation. LS of a large plant in process of being constructed. ARMY PICTORIAL CENTER, 35-11 35th AVE, LIC 1.9 N Y ERBS/kfr
Read moreCollection
Records of the Office of the Chief Signal Officer
Series
Moving Images Relating to Military Activities
Related Videos
Die Hermann-Goring Werke Bauen
Part 1
Munich. [No.] 111, War Crimes Trials, Nuremberg, Germany
Part 2
F-111 Weapon System @ --Fb-111 Flight Characteristics
Part 4
The F-111 Tactical Fighter
Part 3
F-111 Progress Report
Part 3
Pleiger #1- Goering Works (Die Herman - Goring Werke Bauen)
Part 1
Munich. [No.] 327, War Crimes Trials, Nuremberg, Germany
Part 2
War Crimes Trials, Tokyo, Japan ; Munich. [No.] 111, War Crimes Trials, Nuremberg, Germany
Part 1