Video Parts (6 across 2 reels)
This clip is Reel 1, Part 3 of a 6-part film. Watch from the beginning
50-GALLON MECHANIZED FLAME THROWER Reel 1 · Part 3
Description
On the installation and operation of the flamethrower for a medium tank. The three units of the flamethrower are unpacked and disassembled. Each part is passed through the tank hatch and assembled. The fuel containers are filled and liquid and thickened fuels are compared. Demonstrates how to charge the pressure containers. Shows how to fire the flamethrower in short and sustained bursts. A mechanized flamethrower attacks a Japanese-type log and earth pillbox.
Read moreCollection
Records of the Office of the Chief Signal Officer
Series
Related Videos
Arnold Engineering Development Center, Project Able
Part 2
Gt-4 Launch (Engineering)
Part 2
Sts-27 Landing Engineering Item E-1008
Part 3
Human Engineering and the Cortical-Evoked Response
Part 3
Tidal Power
Part 3
Engineer Hotwash
Part 6
Engineering Division Staff Film Report: Esr-4
Part 3
Sts-36 Landing Engineering Item E-1008, 100 Fps
Part 2