Video Parts (6 across 2 reels)
This clip is Reel 2, Part 2 of a 6-part film. Watch from the beginning
MEUSE-ARGONNE OFFENSIVE, SEPTEMBER 26 TO NOVEMBER 11, 1918, SCENES OF TRAFFIC CONDITIONS Reel 2 · Part 2
Description
On transportation problems. Reel 1 shows a demolished bridge at Stenay; France engrs. moving pontoons to the Meuse; supply trains crossing cratered battlefields; 103rd F.A. troops and horses pulling vehicles from mud; supplies passing through rubbled Esnes; and clogged crossroads. Reel 2, wounded are carried to the rear near Sivry. 6th, 304th, 307th, and 527th Engrs. repair roads and bridges. 28th Inf. troops rest by a roadside. 6th F.A. troops advance at Charpentry. 16th, 18th, and 26th Inf. troops advance.
Read moreCollection
Records of the Office of the Chief Signal Officer
Series
Related Videos
Demolished Town, Ranes, France ; Town of Beauvain, France
Part 3
Engineer Corps: Pontoon Bridge Construction [France and Germany, 1918]
Part 1
Crossing the Rhine
Part 1
Training of Engineer Corps Troops, 1918
Part 1
[Tractors, Steam and Gasoline, and Horses]
Part 1
The Rhine Crossing
Part 3
The American Way
Part 2
Replacement Troops Move Up
Part 1