Video Parts (5 across 2 reels)
This clip is Reel 2, Part 1 of a 5-part film. Watch from the beginning
ENGINEER CORPS: PONTOON BRIDGE CONSTRUCTION [FRANCE AND GERMANY, 1918] Reel 2 · Part 1
Description
Reel 1, 114th Engrs. construct a pontoon bridge for the use of personnel at Clamecy. A bridge is assembled on shore and swung across a canal at Ingilise. A barrel bridge is anchored on one shore, floated across the river, and anchored there. A pontoon bridge is constructed. Reel 2, 308th Engrs. build a pontoon bridge across the Rhine at Honningen. 12th F. A. troops cross the bridge.
Read moreCollection
Records of the Office of the Chief Signal Officer
Series
Related Videos
Barge Removal Operations, Niagara River/Peace Bridge
Part 2
Danang River Traffic and Assembly of Danang Floating Bridge
Part 2
New Bridge, Cam Rahn Bay Ab, Vietnam
Part 1
Remagen Bridge Seized
Part 2
Timber Bridge
Part 1
Bridges
Bridge Building with the CCC
Part 1
Berlin Airlift (Edited Footage) - "The Bridge" ; Berlin Airlift (Edited Footage) "Little Vittles"
Part 3