Video Parts (5 across 2 reels)
This clip is Reel 1, Part 2 of a 5-part film. Watch from the beginning
ENGINEER CORPS: PONTOON BRIDGE CONSTRUCTION [FRANCE AND GERMANY, 1918] Reel 1 · Part 2
Description
Reel 1, 114th Engrs. construct a pontoon bridge for the use of personnel at Clamecy. A bridge is assembled on shore and swung across a canal at Ingilise. A barrel bridge is anchored on one shore, floated across the river, and anchored there. A pontoon bridge is constructed. Reel 2, 308th Engrs. build a pontoon bridge across the Rhine at Honningen. 12th F. A. troops cross the bridge.
Read moreCollection
Records of the Office of the Chief Signal Officer
Series
Related Videos
Fuse Canal, Near Braunchweig, Germany ; Infantry Advance-Bridge Across Canal, Near Braunschweig, Germany
Part 1
Remagen Bridge Seized
Part 2
Coast Guard Spots: "Buffalo Barge Operations - Removal From Niagara River/Peace Bridge"
Part 3
Danang River Traffic and Assembly of Danang Floating Bridge
Part 1
America's Great Bridge Test
Part 3
Timber Bridge
Part 3
Building of Bailey Bridge on Okinawa
Part 1
New Bridge, Cam Rahn Bay Ab, Vietnam
Part 1