Heat Shield Development Mockup Part 2
Description
FR# 2097 PAGE 1 stp 2097 HEAT SHIELD DEVELOPMENT ON MOCKUP 10/31/63 ECO 16mm North American Aviation SID 62-367-126 UI loft. CU Slate 14ft. MS Overall view of material development area 33ft. CU Slate 34ft. MS Technicians working on mockup 52ft. CU Slate 54ft. MS Technician injecting ablating material into honeycomb cells 67ft. Slate 68ft. CU Adapter used to locate nozzel of injection gun 90ft. MS Slate 91ft. HS Gunning operation 100ft. MS Slate 102ft. MS Gunning operation 123ft. MCU " = 145ft. MS Same action different angle 174ft. MCU Pan left to right showing partially filled honeycomb 190ft. MS Gunning operation near completion 201ft. MS Slate PSE PAGE 2 2097 202ft. HS Final stage of filling honeycomb with ablative material 235ft. Slate 23fft. ECU Bond line between heat shield and structure surface 251ft. MS Slate 253ft. MS Technician probing in vininity of edge member to detect imperfectly filled cells 267ft. MS Slate 58ft. MS Technician probing 296ft. MS Slate 298ft. CU Heat shield material being probed 307ft. Slate 309ft. MS Technicians enter cover mockup with plastic protective bag and in- stall in curing oven 336ft. MS Slate 337ft. LS Mockup being removed from curing oven 356ft. LS Slate 358ft. LS Mockup positioned on 16-foot vertical turret lath with machine operator setting angle of tool carrier PAGE 3 2097 391ft. MS Slate 393dt. MS Tool carrier traverse being checked against master fixture 429ft. CU Slate 431ft. CU Dial indicater on tool carrier 441ft. MS Slate 442ft. MS Start of grinding operation on mockup 459ft. MS Slate 460ft. MS Start of grinding operation 474ft. MS Slate 475ft. MCU Start of grinding operation 489ft. MCU Slate 490ft. MCU Start of grinding operation 507ft. HB Slate 508ft. MS Grinding operation at mid point of mockup 519FL. MS Slate 520ft. MS Grinding operation at mid point of mockup 534ft. CU Slate 535ft. CU Grinding operation at mid point of meckup PAGE 4 2097 557ft. CU Slate 558ft. CU Work table rotating with tilt up to grinding head 574ft. CU Slate 575ft. MS Mockup rotating on work table 598ft. HS Grinding operation from above 610ft. CU Grinding operation near bottom edge 629ft. MS Slate 630ft. MS Completion on grinding operation 649ft. MS Slate 650ft. Grinding operation at bottom edge of mockup 556ft. MCU " " 660ft. CU = " 670ft. MS End of grinding operation table stops rotating 693ft. MS Slate 694ft. MS Pan over finish surface of mockup 729ft. CU Slate 730ft. CU Finish surface PAGE 5 2097 743ft. MS Slate 744ft. MS Finish mockup 763ft. MS Slate 54ft. MS Doors to x-ray inspection chamber opening 797ft. MS Slate 798ft. MS Technicians positioning film packs over top edge of mockup 826ft. MS Slate 827ft. MS Technicians positioning film packs on mockup 842ft. MS Slate 843ft. MS Technicians complete application of one roll of film packs to mockup and take measurements to establish exposure. 856ft. MS Slate 858ft. MS Technicians complete application film packs and exit 870ft. MS Slate 872ft. MS Doors to --ray inspection chamber closing 904Ft. MS Slate 905ft. MS Radiation dengersign on closing doors 916ft. MS Slate PAGE I 2097 917ft. MS Technicians remove expose film packs from module 948ft. MS Slate 979ft. MS Technicians apply strip of film packs across mid section of mockup 971ft. MS Slate 973ft. MS Technicians apply strip of film packs across bottom edge of mockup 994ft. END OF ROLL
Read moreCollection
Records of the National Aeronautics and Space Administration
Series
Moving Images Relating to Documentary Stock Footage
Related Videos
North American Aviation - Submittal Number 66 (Sid 62-367-66) - Waste Water Evaluation for Drinking Purposes
Part 2
Assembly Boilerplate Number 12, North American Aviation, Submittal Number 122
Part 1
Ksc - Sts-63 Overall View of Launch Vehicle During Ignition and Liftoff, View Inside of Ssme Nozzle 1 and 3 and Surrounding Heat Shield During Ignition and Liftoff
Part 3
Nar - Apollo Film Submittal Sid 62-367-439 and 440
Part 2
Disc Flight Development, Avrocar Progress Report, 1 February - 31 August 1958
Part 2
First Mb-1 R0cket Launch From F-102A Mockup Fuselage
Part 1
Argentine Floods (Universal Newsreel, Aug 1958)
Taiwanese Development Model