LINCOLN BRIDGE, WESEL, GERMANY ; VEHICLES CROSSING RHINE, LUDWIGSHAFEN, GERMANY Part 3
Description
Signal Corps 821 ADC 3821 SOURCE: AFCF (M-1545-1548) FILM: Arch MP & APC MP, 713' Silent LINCOLN BRIDGE Wesel, Germany; 30 March 1945 (LIB 4967) Seq: Engineers working on construction of railroad bridge across Rhine River. vs, pile drivers in action. Seq: Soldiers stringing up captured German floodlights. VEHICLES CROSSING RHINE Ludwigshafen, Germany; 2 April 1945 (LIB 4968) MSs, prime movers towing 9mm AA guns crossing ponton bridge. vs, trucks and tank retrievers crossing bridge. CUs, ponton bridge sagging under heady load as tank retriever, loaded with gasoline, makes crossing. Record Group 111 Accession Number III-NAV-210 ARMY PICTORIAL CENTER, 35-11 35TH AVE., LIC 1, NY MS/sj
Read moreCollection
Records of the Office of the Chief Signal Officer
Series
Moving Images Relating to Military Activities
Related Videos
Engineer Corps: Pontoon Bridge Construction [France and Germany, 1918]
Part 1
Airborne"--Chateaudun, France to Wesel, Germany
Part 2
Fixed Bridge Construction and Repair in the Cbi
Part 3
On the March, Heckuscheid, Germany ; Outpost Over Our River, Peterskirche, Belgium ; Nedergegen, Germany ; Gen. Patton Inspects Sauer River Bridgeheads, Follendor, Germany ; Engineers Bridge Saar River, Saarlautern, Germany
Part 2
Easter Sunday Services on the Rhine, Wesel, Germany
Part 2
Signal Corps Cameramen, Germany
Part 2
Engineers in Combat
Part 2